Blog
Field notes: the search ring where every candidate failed differentlyA field story from one search ring where five rooftop candidates each failed for a different reason, and what a pre-walk imagery pass would have caught.
What is a Fresnel zone and why it matters for rooftop screeningWhat a Fresnel zone is, why a clear satellite view doesn't mean clear line of sight, and how to screen rooftop candidates for real clearance.
Guyed vs. self-support towers: telling them apart from overhead imageryHow to spot guyed and self-support lattice towers in VHR satellite imagery before sending a crew to check a candidate structure in person.
Usable height vs. building height on a rooftop candidateBuilding height is a public record. Usable height on a rooftop candidate is what's left after roof clutter, structure, and sightlines eat into it.
Field notes: the week a repaint ruined our height estimateA municipal tank got a fresh coat of paint mid-ring-walk, and the edge the model had been reading as the tank rim moved six feet.
What a fall zone is, and why it kills rooftop candidates in dense search ringsWhat a fall zone requires, how it differs for rooftops versus ground-mount sites, and why it rules out rooftop candidates in tight search rings.
What counts as usable roof access for a tower crewA ladder gets a tech to the roof. It doesn't tell you if a crew can move equipment up. Here's what usable rooftop access requires.
Non-penetrating roof mounts: why landlords ask for oneWhat a non-penetrating roof mount is, why property owners push for it over a penetrating install, and how it affects your rooftop lease negotiation.
Field notes: the rooftop that looked perfect until we found the chillerA field-notes look at how rooftop mechanical clutter wrecks a candidate that looked perfect on the basemap, and what to screen for before the site walk.
How to read a structural letter before you schedule a site walkWhat the stress ratio, loading case, and conditions in a TIA-222 structural letter tell a site acquisition specialist before booking a field crew.
Spotting rooftop HVAC clutter that disqualifies an antenna candidateA roof clutter survey checklist for site acquisition reps: spotting mechanical setback problems that disqualify a rooftop antenna candidate before the walk.
What is a structural letter, and when does a rooftop lease need one?A structural letter is the PE sign-off a rooftop lease needs before antennas go up. Here's what it covers and when to order one.
How to rank search ring candidates before scheduling a site walkHow to rank search ring candidates by usable height, roof access, and sightline clearance before you schedule a site walk.
What is a host structure in cell site acquisition?A plain definition of "host structure" in tower site acquisition, how it differs from a candidate structure, and what makes one buildable.
How to define a search ring for a cell siteA working breakdown of how RF engineers set search ring radius and how site acquisition turns that circle into a short list of real candidates.
Rooftop vs monopole: how to decide which site to pursueA field guide for site acquisition specialists weighing rooftop collocation against a new monopole build inside a search ring.